Wales & West Gas Pipeline ProtectionWorking With GJ Bogmats

In late winter of 2016, GJ Bogmats was asked to provide over 400 interlocking cover slabs for Wales & West Gas.

The project was for pipeline protection for an existing 600mm Diameter HP pipeline, where new works are currently being carried out on the A465 dual carriageway for the Welsh Assembly. The client was Fastflow on behalf of Wales & West Gas.

  • Client needed large amount of mats 
  • Pipeline protection
  • Welsh Assembly contract on busy carriageway 

The teams focused their efforts on providing a reliable solution to protect the pipeline on the busy carriageway.

Our vast health and safety knowledge meant we were able to provide advice on the work carried out. All mats were laid and delivered on time. There were a total of 400 interlocking mats provided by GJ Mats to protect the pipeline.